
Cambodian Skills Delivery Model
Advanced Diploma of Air Conditioning and Refrigeration Engineering
KHQ-ELT6-012 · Delivery Course: KHC-ELT6-012
This qualification covers competencies to design and validate/evaluate refrigeration and air conditioning equipment and systems, manage risk, estimate and manage projects and provide technical advice/sales. It includes regulatory requirements for purchasing and handling refrigerants. It develops competencies in the ethical and responsible application of mathematics, science, engineering techniques, standards and codes of practice, engineering design practices, supervision and management of physical, human and financial resources in refrigeration and air conditioning engineering. Competency development activities in this qualification are subject to regulations directly related to licencing. A relevant contract of training through an apprenticeship or relevant employment may be required to enable the application of the required knowledge and skills to on the job work activities and environments. Refrigerant Handling Licence: The achievement of the qualification meets the training components for the full national Refrigerant Handling Licence which is required to work on refrigeration and air conditioning equipment that carries the risk of a fluorocarbon refrigerant being emitted whil
There are no entry requirements for this qualification.
Packaging Rules
A total of 2230 weighting points comprising: 1980 core weighting points listed below; plus 250 general elective weighting points from the general elective units listed below. Choose a total of 250 weighting points elective units from the list below, of which between 0 and 120 weighting points can be taken from Group A; and between 0 and 30weighting points can be taken from Group B; and between 0 and 60weighting points can be taken from Group C; and between 0 and 120weighting points can be taken from Group D; and between 120 and 250 weighting points must be taken from Group E; or all electives units of 250 weighting points can be taken from Group E. Up to 120 weighting points of the general elective units Group A, may be selected, with appropriate contextualisation, from any relevant nationally endorsed Training Package or accredited course, provided selected units contribute to the vocational outcome of the qualification. If weighting points are not listed for an imported unit in any other UEE qualification, default weighting will be 10 points. There are units of competency within this qualification that contain pre-requisites. Units of competency that have a pre-requisite requirement are identified by this symbol *. Refer directly to the units of competency to identify pre-requisite requirements to ensure all are complied with. A list of all pre-requisites is also provided in the UEE Pre-requisites Companion Volume. Where imported units are selected, care must be taken to ensure all pre-requisite units specified are complied with. Core units Weighting Points UEECD0003 Apply industry and community standards to engineering activities 20 UEECD0007 Apply work health and safety regulations, codes and practices in the workplace 20 UEECD0010 Compile and produce an energy sector detailed report 60 UEECD0016 Document and apply measures to control WHS risks associated with electrotechnology work* 20 UEECD0017 Establish and follow a competency development plan in an electrotechnology engineering discipline 120 UEECD0019 Fabricate, assemble and dismantle utilities industry components* 40 UEECD0020 Fix and secure electrotechnology equipment* 20 UEECD0024 Implement and monitor energy sector WHS policies and procedures 20 UEECD0026 Manage risk in electrotechnology activities 60 UEECD0042 Solve problems in ELV single path circuits* 40 UEECD0051 Use drawings, diagrams, schedules, standards, codes and specifications* 40 UEECS0033 Use engineering applications software on personal computers 40 UEERA0001 Analyse the operation of HVAC air and hydronic systems* 80 UEERA0002 Analyse the psychrometric performance of HVAC/R systems* 50 UEERA0004 Analyse vibration and noise in refrigeration and air conditioning systems* 80 UEERA0031 Diagnose and rectify faults in air conditioning and refrigeration control systems* 60 UEERA0034 Establish heat loads for commercial refrigeration and/or air conditioning applications* 80 UEERA0035 Establish the basic operating conditions of air conditioning systems* 20 UEERA0036 Establish the basic operating conditions of vapour compression systems* 60 UEERA0038 Establish the thermodynamic parameters of refrigeration and air conditioning systems* 80 UEERA0042 Evaluate thermodynamic and fluid parameters of refrigeration systems* 100 UEERA0044 Find and rectify faults in single phase motors and associated controls* 40 UEERA0045 Find and rectify faults in three phase motors and associated controls* 30 UEERA0050 Install refrigerant pipe work, flow controls and accessories* 60 UEERA0099 Install, commission, service and maintain air conditioning systems* 80 UEERA0052 Install, commission, service and maintain low temperature systems* 40 UEERA0053 Install, commission, service and maintain medium temperature systems* 60 UEERA0055 Manage refrigeration and air conditioning projects 40 UEERA0058 Plan refrigeration and air conditioning projects 60 UEERA0059 Prepare and connect refrigerant tubing and fittings* 40 UEERA0061 Produce HVAC/R