Design drainage systems

KHU-AGR-0218

Australian Equivalent
AHCDRG502
Elements
4
Learning Outcomes
29

This unit of competency describes the skills and knowledge required to identify design requirements, determine specifications, capital expense and operating expense budgets and design the drainage system. The unit applies to individuals who apply specialised skills and knowledge to the design of drainage systems, and take personal responsibility and exercise autonomy in undertaking complex work. They analyse and synthesise information and analyse, design and communicate solutions to sometimes complex problems. No licensing, legislative or certification requirements apply to this unit at the time of publication.

Elements & Learning Outcomes

4
E1Determine design requirements
0218.E1.O1Determine water transfer, recharge, reuse and harvesting system needs
0218.E1.O2Identify processes of collecting, disposing and storing drainage water to avoid degrading water quality
0218.E1.O3Investigate regional geology and geography to predict drainage parameters
0218.E1.O4Apply hydrological calculations to predict volumes and rates of surface run-off
0218.E1.O5Conduct site investigations to assess depth of clay, depth of ground water, soil and water salinity, and structural or chemical impediments
0218.E1.O6Determine the most cost effective drainage system
0218.E1.O7Document predictions of leaching fractions and salt movements, and develop soil amelioration and drainage management plans
0218.E1.O8Determine the need for leachate interception and dewatering system and if required prepare construction specification for interception and collection, disposal, reuse or recycle
0218.E1.O9Confirm drains and structures are capable of carrying the design water volumes and intensities according to workplace standards
0218.E1.O10Identify construction specifications required to make drainage systems according to environmental and workplace health and safety requirements
0218.E1.O11Identify and protect environmentally sensitive areas according to local, state and federal legislation and regulations
E2Design a drainage system
0218.E2.O1Select systems, including relevant equipment, to move water efficiently to water storage or treatment and at the flow and pressure required in design specifications
0218.E2.O2Select system combinations that are efficient, reliable, functional, serviceable and flexible for the intended application
0218.E2.O3Determine energy requirements and check layout of electricity lines with local authority if electrical pumps and motors are used in the system
0218.E2.O4Select and integrate structures, pipes, valves and accessories into a functional system that can be monitored and maintained
0218.E2.O5Define the work required to make suitable drainage systems available to the workplace in the design specifications
0218.E2.O6Confirm power supply design specification with power authorities if electrical pumps and motors are used in the system
0218.E2.O7Minimise drainage system design damage based on current industry practice
0218.E2.O8Document drainage system design based on current industry practice
0218.E2.O9Confirm design output with an appropriately experienced and qualified person
E3Determine capital expense budget
0218.E3.O1Estimate materials required from plans and specifications
0218.E3.O2Estimate labour requirements based on documented work schedule with reasonable allowance for variances in work schedules
0218.E3.O3Base costing for each component on quoted information from suppliers, or sound analysis of individual elements
0218.E3.O4Document design calculations, performance indicators and decisions and relevant information in plans, specifications and manuals
0218.E3.O5Document capital expense budget based on current industry practice
0218.E3.O6Confirm capital expense budget output with an appropriately experienced and qualified person
E4Determine operating expense budget
0218.E4.O1Optimise the relationship between capital and operational costs including a comparison of energy sources
0218.E4.O2Collate all operating expense applicable to the completed drainage system and calculate an operating expense budget
0218.E4.O3Document operating expense budget based on current industry practice
SEAL — South East Asia Learning Identifier & Skills Portal · Prepared for MLVT Executive approval and TVET institute review · Derived from the Australian National Training Register (training.gov.au, CC-BY) and aligned to the Cambodian Qualifications Framework and DSC Standard Training Packages · Delivered via Gibble SMS · July 2026