MLVT
SKILLS PORTAL
ព្រះរាជាណាចក្រកម្ពុជា · KINGDOM OF CAMBODIA

Cambodian Skills Delivery Model

SEAL National Course Catalogue · MLVT / National Training Board
អត្តសញ្ញាណប័ណ្ណសិក្សាអាស៊ីអាគ្នេយ៍ការរៀនសូត្រពេញមួយជីវិត • អធិបតេយ្យដោយការរចនាSEALSOUTH EAST ASIA LEARNING IDENTIFIERកម្ពុជា២០២៦
54
Sector Frameworks
1,164
Qualifications
15,161
Competency Units
10,938
Elements
41,782
Learning Outcomes
2,822
Assessment Packages

Lay paving

KHU-AGR-0337

Australian Equivalent
AHCLSC209
Elements
6
Learning Outcomes
25

This unit of competency describes the skills and knowledge required to lay modular paving in landscape settings, including preparing for work, setting out paving area, ground preparation, laying bedding material and pavers, and cleaning up site. The unit applies to individuals who lay paving under general supervision with limited autonomy or accountability. No licensing, legislative or certification requirements apply to this unit at the time of publication.

Elements & Learning Outcomes

6
E1Plan and prepare for paving work
0337.E1.O1Read work instructions relating to paving work and confirm with supervisor
0337.E1.O2Prepare and use tools and equipment according to supervisor instructions
0337.E1.O3Check and confirm quantity and quality of materials according to job plan requirements
0337.E1.O4Identify workplace health and safety hazards, assess risks and report to supervisor
0337.E1.O5Select, fit, use and maintain personal protective equipment (PPE) applicable to task
E2Set out and prepare paving area
0337.E2.O1Mark out area to be paved according to site plan
0337.E2.O2Assist with pegging reduced levels of proposed paving area according to site plan and supervisor instructions
0337.E2.O3Maintain clean and safe worksite during paving activities
E3Undertake ground preparation
0337.E3.O1Excavate area to shape, depth and dimensions to sub-base level
0337.E3.O2Trim subbase to designated level and falls to ensure that final level of paving can be achieved
0337.E3.O3Assist with construction of drainage systems according to site plan
0337.E3.O4Place and compact base material to required depth according to site plan
E4Lay bedding material
0337.E4.O1Establish screed rails to ensure bedding course is maintained
0337.E4.O2Spread bedding material evenly over area according to supervisor instructions
0337.E4.O3Level bedding material to designated level and falls
E5Lay pavers to a given pattern
0337.E5.O1Set grid string lines to required levels to ensure designated pattern of project is attained and to maintain straight lines of components
0337.E5.O2Set out pavers to required dimensions and pattern
0337.E5.O3Lay whole pavers and compact to established finish level
0337.E5.O4Mark, cut and fit pavers to fill gaps in pattern within nominated tolerances
0337.E5.O5Install permanent edge constraints to prevent movement of pavers
0337.E5.O6Spread jointing material over paved area and compact to finished level
E6Clean site and store tools and equipment
0337.E6.O1Sweep jointing material evenly over paving
0337.E6.O2Dispose of or recycle soil and waste material from site
0337.E6.O3Clean, maintain and store tools and equipment
0337.E6.O4Report work outcomes, and malfunctions, faults, wear or damage of tools to supervisor
SEAL — South East Asia Learning Identifier & Skills Portal · Prepared for MLVT Executive approval and TVET institute review · Derived from the Australian National Training Register (training.gov.au, CC-BY) and aligned to the Cambodian Qualifications Framework and DSC Standard Training Packages · Delivered via Gibble SMS · July 2026