MLVT
SKILLS PORTAL
ព្រះរាជាណាចក្រកម្ពុជា · KINGDOM OF CAMBODIA

Cambodian Skills Delivery Model

SEAL National Course Catalogue · MLVT / National Training Board
អត្តសញ្ញាណប័ណ្ណសិក្សាអាស៊ីអាគ្នេយ៍ការរៀនសូត្រពេញមួយជីវិត • អធិបតេយ្យដោយការរចនាSEALSOUTH EAST ASIA LEARNING IDENTIFIERកម្ពុជា២០២៦
54
Sector Frameworks
1,164
Qualifications
15,161
Competency Units
10,938
Elements
41,782
Learning Outcomes
2,822
Assessment Packages

Implement a paving project

KHU-AGR-0344

Australian Equivalent
AHCLSC316
Elements
5
Learning Outcomes
25

This unit of competency describes the skills and knowledge required to install and construct a paved surface, including preparing for paving project, setting out and preparing site, implementing the paving project, installing stone paving, checking and cleaning up site. The unit applies to individuals who implement a paving project under broad direction, and take responsibility for their own work and for the quality of the work of others. State/territory licensing, legislative or certification requirements apply in some jurisdictions. Users are advised to check with the relevant regulatory authority.

Elements & Learning Outcomes

5
E1Prepare for paving project
0344.E1.O1Interpret site plans and specifications
0344.E1.O2Identify potential hazards and risks, and implement safe working practices to manage risks
0344.E1.O3Select tools, equipment and machinery required to implement a paving project and check for safe operation
0344.E1.O4Identify and ameliorate environmental impacts of proposed works
0344.E1.O5Select, fit, use and maintain personal protective equipment (PPE) applicable to the task
0344.E1.O6Organise delivery of materials to site according to workplace priorities
E2Set out and prepare the site
0344.E2.O1Erect site bunting, control pedestrian access and place safety signage
0344.E2.O2Determine, locate and mark out services from site plan
0344.E2.O3Make provision for irrigation lines to cross paved areas
0344.E2.O4Mark out paving pattern according to plans and specifications
0344.E2.O5Place and compact sub-base material to required finished levels
0344.E2.O6Incorporate surface drainage as specified
E3Implement paving project
0344.E3.O1Construct paving according to plans and specification
0344.E3.O2Install appropriate drainage as required
0344.E3.O3Use tools, equipment and machinery safety in accordance with workplace safe operating procedures and workplace health and safety requirements
E4Install stone paving
0344.E4.O1Set out and prepare area to be paved according to site plan
0344.E4.O2Excavate area to shape, depth and dimensions to sub-base level
0344.E4.O3Trim the sub-base to designated level and falls and place and compact base material to finished level
0344.E4.O4Spread bedding material over area and level to designated level and falls
0344.E4.O5Treat, place and fit stone accurately and fill gaps in the pattern within tolerances nominated in site plan and specifications
0344.E4.O6Install edge constraints as required by site plan
E5Check quality of work and clean-up site
0344.E5.O1Inspect quality of finished works to ensure standard of finished paving project is in accordance with design drawings and specifications
0344.E5.O2Clean work-site and dispose of or recycle waste material from site
0344.E5.O3Clean, maintain and store tools, equipment and machinery
0344.E5.O4Identify and report unserviceable tools, equipment and machinery according to workplace procedures
SEAL — South East Asia Learning Identifier & Skills Portal · Prepared for MLVT Executive approval and TVET institute review · Derived from the Australian National Training Register (training.gov.au, CC-BY) and aligned to the Cambodian Qualifications Framework and DSC Standard Training Packages · Delivered via Gibble SMS · July 2026