Install water features

KHU-AGR-0348

Australian Equivalent
AHCLSC320
Elements
4
Learning Outcomes
22

This unit of competency describes the skills and knowledge required to install water features, including preparing for work, setting out and preparing site, installing water feature and accessories, checking and cleaning up site. Water features may include waterfalls, ponds, waterways and fountains. They may be prefabricated as supplied by irrigation suppliers and garden centres or formed on site. The unit applies to individuals who install water features under broad direction, and take responsibility for their own work and for the quality of the work of others. No licensing, legislative or certification requirements apply to this unit at the time of publication.

Elements & Learning Outcomes

4
E1Plan and prepare work
0348.E1.O1Interpret site plans and specifications
0348.E1.O2Identify potential hazards and risks, and implement safe working practices to manage risks
0348.E1.O3Check quantity and quality of materials
0348.E1.O4Select tools and equipment required for installation work and check for serviceability
0348.E1.O5Select, fit, use and maintain personal protective equipment (PPE) applicable to the task
0348.E1.O6Identify environmental implications of constructing water features
E2Set out and prepare the site
0348.E2.O1Determine, locate and mark out services from site plan
0348.E2.O2Determine exact location and depth of excavations and mark out accordingly
0348.E2.O3Excavate site to shape, depth and dimensions as marked out
0348.E2.O4Construct drainage systems as specified
0348.E2.O5Place and compact bedding material to required finished levels
0348.E2.O6Sort and stockpile soil and waste material ready for removal, reuse or recycling
E3Install water feature and accessories
0348.E3.O1Install waterproof membrane, prefabricated shell or formed 'in situ' feature as specified
0348.E3.O2Install all accessories to feature as specified with consideration to safety issues
0348.E3.O3Fill feature with water, test for leaks and repair accordingly
0348.E3.O4Treat water to remove or neutralise contaminants resulting from excavation and installation work
E4Check quality of work and clean-up site
0348.E4.O1Check any mechanical features and adjust to ensure correct operation
0348.E4.O2Inspect quality of finished works to ensure required standard has been achieved
0348.E4.O3Clean debris from structure and site
0348.E4.O4Dispose of or recycle soil and waste material from site
0348.E4.O5Clean, maintain and store tools and equipment
0348.E4.O6Identify and report unserviceable tools and equipment according to workplace procedures
SEAL — South East Asia Learning Identifier & Skills Portal · Prepared for MLVT Executive approval and TVET institute review · Derived from the Australian National Training Register (training.gov.au, CC-BY) and aligned to the Cambodian Qualifications Framework and DSC Standard Training Packages · Delivered via Gibble SMS · July 2026