Assist with turf construction

KHU-AGR-0778

Australian Equivalent
AHCTRF206
Elements
5
Learning Outcomes
20

This unit of competency describes the skills and knowledge required to assist in the construction of soil profiles for the establishment of a turf surface. The unit applies to individuals who support turf construction and undertake defined routine activities under supervision. They exercise limited autonomy within established and well-known parameters, providing solutions to a limited range of predictable problems. No licensing, legislative or certification requirements apply to this unit at the time of publication.

Elements & Learning Outcomes

5
E1Prepare for soil profile construction
0778.E1.O1Interpret site and construction plans to locate services in consultation with the supervisor
0778.E1.O2Identify workplace health, safety and environmental hazards, assess risks and implement controls in consultation with supervisor
0778.E1.O3Select safety equipment, signage and barriers required according to the construction plan
0778.E1.O4Install safety equipment to ensure construction site is secure
E2Prepare equipment for soil profile construction
0778.E2.O1Select tools, equipment and machinery according to construction project requirements
0778.E2.O2Carry out pre-operational and safety checks on tools, equipment and machinery
0778.E2.O3Report faulty or defective equipment and machinery according to workplace procedures
0778.E2.O4Select, ensure serviceability of, fit and use personal protective equipment
E3Undertake soil profile construction
0778.E3.O1Interpret site construction plan to establish grades, levels and boundaries of works
0778.E3.O2Use basic survey equipment to assist construction team to mark out and define grades, levels and boundaries
0778.E3.O3Use hand tools and machinery to grade and consolidate the base according to specifications
0778.E3.O4Excavate drainage and irrigation trenches to depth, width and fall specified in the construction plan
0778.E3.O5Remove and store excavated material safely according to construction plan specifications
E4Restore the site after drainage and irrigation installation
0778.E4.O1Back fill trenches, consolidate and level the site to construction plan specifications
0778.E4.O2Restore the soil profile, maintaining levels of each layer
0778.E4.O3Irrigate the restored site according to soil profile requirements
0778.E4.O4Collect and dispose of waste material from the site
E5Clean and store equipment and machinery
0778.E5.O1Clean and maintain tools, equipment and machinery according to workplace procedures
0778.E5.O2Collect and store tools, equipment, machinery and unused materials
0778.E5.O3Report work outcomes to supervisor
SEAL — South East Asia Learning Identifier & Skills Portal · Prepared for MLVT Executive approval and TVET institute review · Derived from the Australian National Training Register (training.gov.au, CC-BY) and aligned to the Cambodian Qualifications Framework and DSC Standard Training Packages · Delivered via Gibble SMS · July 2026