MLVT
SKILLS PORTAL
ព្រះរាជាណាចក្រកម្ពុជា · KINGDOM OF CAMBODIA

Cambodian Skills Delivery Model

SEAL National Course Catalogue · MLVT / National Training Board
អត្តសញ្ញាណប័ណ្ណសិក្សាអាស៊ីអាគ្នេយ៍ការរៀនសូត្រពេញមួយជីវិត • អធិបតេយ្យដោយការរចនាSEALSOUTH EAST ASIA LEARNING IDENTIFIERកម្ពុជា២០២៦
54
Sector Frameworks
1,164
Qualifications
15,161
Competency Units
10,938
Elements
41,782
Learning Outcomes
2,822
Assessment Packages

Install vehicle lighting and wiring systems

KHU-AUT-0102

Australian Equivalent
AURETR009
Elements
3
Learning Outcomes
13

This unit describes the performance outcomes required to install vehicle, vessel or machinery low voltage (LV) direct current (DC) lighting and wiring systems that are not an integral part of vehicle or machinery controller area network databus (CAN-bus) topography. It involves preparing for the task, installing and testing the operation of lighting and wiring systems, and completing workplace processes and documentation. It applies to those working in the automotive service and repair industry. LV lighting and wiring systems include those in agricultural machinery, heavy commercial vehicles, light vehicles, vessels, mobile plant machinery, motorcycles or outdoor power equipment. No licensing, legislative, regulatory or certification requirements apply to this unit at the time of publication.

Elements & Learning Outcomes

3
E1Prepare to install, lighting and wiring system
0102.E1.O1Job requirements are determined according to workplace instructions
0102.E1.O2Manufacturer specifications and installation fitting instructions are accessed and interpreted
0102.E1.O3Installation options are analysed and those most appropriate to the circumstances are selected
0102.E1.O4Hazards associated with the work are identified and risks are managed
0102.E1.O5Tools and equipment are selected and checked for serviceability
E2Install and test system
0102.E2.O1Lighting and wiring system and components are checked for correct application and damage
0102.E2.O2Lighting and wiring system is installed according to manufacturer specifications, workplace procedures and safety requirements, and without causing damage to components or other systems
0102.E2.O3Installed system and components are tested for correct operation according to workplace procedures and manufacturer specifications
0102.E2.O4Post-installation testing of other electrical systems is carried out according to workplace procedures to confirm correct operation, and that any problems detected as having been introduced during installation process are rectified
E3Complete work processes
0102.E3.O1Final inspection is made to ensure work is to workplace expectations and vehicle, vessel or machinery is presented ready for use
0102.E3.O2Work area is cleaned, waste and non-recyclable materials are disposed of, and recyclable material is collected
0102.E3.O3Tools and equipment are checked and stored and any faulty electrical equipment is identified, tagged and isolated according to workplace procedures
0102.E3.O4Workplace documentation is processed according to workplace procedures
SEAL — South East Asia Learning Identifier & Skills Portal · Prepared for MLVT Executive approval and TVET institute review · Derived from the Australian National Training Register (training.gov.au, CC-BY) and aligned to the Cambodian Qualifications Framework and DSC Standard Training Packages · Delivered via Gibble SMS · July 2026