MLVT
SKILLS PORTAL
ព្រះរាជាណាចក្រកម្ពុជា · KINGDOM OF CAMBODIA

Cambodian Skills Delivery Model

SEAL National Course Catalogue · MLVT / National Training Board
អត្តសញ្ញាណប័ណ្ណសិក្សាអាស៊ីអាគ្នេយ៍ការរៀនសូត្រពេញមួយជីវិត • អធិបតេយ្យដោយការរចនាSEALSOUTH EAST ASIA LEARNING IDENTIFIERកម្ពុជា២០២៦
54
Sector Frameworks
1,164
Qualifications
15,161
Competency Units
10,938
Elements
41,782
Learning Outcomes
2,822
Assessment Packages

Install flooring systems

KHU-CON-0107

Australian Equivalent
CPCCCA3003
Elements
6
Learning Outcomes
22

This unit of competency specifies the skills and knowledge required to plan, prepare, set out and install timber and steel flooring systems to support the internal and external walls of a residential building, meeting all relevant requirements of the National Construction Code (NCC), Australian Standards, work health and safety (WHS), and Commonwealth and state or territory legislation and National Association of Steel-Framed Housing (NASH) standard for steel-framed construction in bushfire areas. The unit includes installation of flooring systems in bedrooms, living areas, kitchens, bathrooms, balconies and decks. Completion of the general construction induction training program specified by the model Code of Practice for Construction Work is required for any person who is to carry out construction work. Achievement of CPCWHS1001 Prepare to work safely in the construction industry meets

Elements & Learning Outcomes

6
E1Plan and prepare.
0107.E1.O1Read and interpret work instructions and plan sequence of work.
0107.E1.O2Plan all work to comply with laws and regulations, the National Construction Code (NCC), Australian Standards, work health and safety (WHS) and environmental requirements, manufacturers’ specifications, workplace requirements, drawings and specifications.
0107.E1.O3Select tools and equipment, check for serviceability and report any faults.
0107.E1.O4Select and use personal protective equipment (PPE) as required for each stage of the task.
0107.E1.O5Inspect work site, locate services, assess hazards and apply risk controls, including required signage and barricades.
0107.E1.O6Select materials required for task, calculate quantities, handle safely and prepare and position ready for use.
E2Set out and install support structure.
0107.E2.O1Position support structure, stumps/piers to set-out lines, drawings and specifications.
0107.E2.O2Install support structure.
0107.E2.O3Check support structure, posts, stumps and piers for level, plumb and square.
E3Install bearers.
0107.E3.O1Mark and cut bearer material to lengths for joining over supports.
0107.E3.O2Make arrangements for damp proof course and termite shield to be installed where specified by regulations.
0107.E3.O3Locate and fix bearers and check and adjust for square, in-line and level.
0107.E3.O4Fix waling plates for decks and balconies to external walls.
E4Install floor joists.
0107.E4.O1Set out location for floor joists using spacings in accordance with drawings and specifications.
0107.E4.O2Check floor joists for straightness, then fit and fix to line and level.
0107.E4.O3Fit and fix supporting blocks and trimmers around doorways and openings.
0107.E4.O4Cut, fit and fix trimmers to support sheet flooring joints.
E5Install flooring.
0107.E5.O1Check flooring materials for suitability.
0107.E5.O2Confirm floor measurements and cut and prepare flooring materials for installation with a minimum of waste.
0107.E5.O3Install and secure flooring to manufacturers’ specifications.
E6Clean up.
0107.E6.O1Clean up, meeting all legislative and workplace requirements for safety, waste disposal and materials handling.
0107.E6.O2Check, maintain and store tools and equipment and report any faults.
SEAL — South East Asia Learning Identifier & Skills Portal · Prepared for MLVT Executive approval and TVET institute review · Derived from the Australian National Training Register (training.gov.au, CC-BY) and aligned to the Cambodian Qualifications Framework and DSC Standard Training Packages · Delivered via Gibble SMS · July 2026