Erect roof trusses

KHU-CON-0110

Australian Equivalent
CPCCCA3006
Elements
3
Learning Outcomes
16

This unit of competency specifies the skills and knowledge required to select, set out, erect and brace timber and steel roof trusses in preparation for the installation of waterproof roof coverings, meeting all relevant requirements of the National Construction Code (NCC), Australian Standards, National Association of Steel-framed Housing (NASH) Standards, work health and safety (WHS), and Commonwealth and state or territory legislation. The unit includes erection of manufactured roof trusses in accordance with AS 4440 Installation of nail-plated timber roof trusses. Completion of the general construction induction training program specified by the model Code of Practice for Construction Work is required for any person who is to carry out construction work. Achievement of CPCWHS1001 Prepare to work safely in the construction industry meets this requirement. No licensing, legislative or

Elements & Learning Outcomes

3
E1Plan and prepare.
0110.E1.O1Read and interpret work instructions and plan sequence of work.
0110.E1.O2Plan all work to comply with laws and regulations, the National Construction Code (NCC), Australian Standards, work health and safety (WHS) and environmental requirements, manufacturers’ specifications, workplace requirements, drawings and specifications.
0110.E1.O3Select tools and equipment, check for serviceability and report any faults.
0110.E1.O4Select and use personal protective equipment (PPE) for each part of the task.
0110.E1.O5Inspect work site, locate services, assess hazards and apply risk controls, including required signage and barricades.
0110.E1.O6Identify materials required from truss layout plan, including fasteners and steel brackets, calculate quantities, handle safely and prepare and position ready for use.
E2Erect roof trusses.
0110.E2.O1Set out location of roof trusses on top plates to truss layout plan.
0110.E2.O2Manage lifting and handling of materials, including lifting trusses and stacking loads on wall frames ready for use.
0110.E2.O3Erect, plumb and fix roof trusses to set out positions in correct sequence to align at apex.
0110.E2.O4Install bottom chord at constant height above internal wall plates and use to provide lateral support for internal walls.
0110.E2.O5Fix ceiling trimming and creeper trusses.
0110.E2.O6Construct and fix roof bracing following AS 4440 Installation of nail-plated timber roof trusses and National Association of Steel-framed Housing (NASH) Standards.
0110.E2.O7Fix lateral restraints to truss chords in position to manufacturers’ specifications.
0110.E2.O8Install roof and internal wall bracing connections, including tie downs, for wind load following manufacturers’ guidelines and AS 4440 and NASH.
E3Clean up.
0110.E3.O1Clean up, meeting all legislative and workplace requirements for safety, waste disposal and materials handling.
0110.E3.O2Check, maintain and store tools and equipment and report any faults.
SEAL — South East Asia Learning Identifier & Skills Portal · Prepared for MLVT Executive approval and TVET institute review · Derived from the Australian National Training Register (training.gov.au, CC-BY) and aligned to the Cambodian Qualifications Framework and DSC Standard Training Packages · Delivered via Gibble SMS · July 2026