0135.E1.O1Review scaffolding task and workplace-specific information relating to the task and confirm with associated personnel.
0135.E1.O2Identify environmental protection and legislative requirements for scaffolding task and incorporate into planning and preparation.
0135.E1.O3Identify hazards, control measures and equipment associated with the workplace and scaffolding task from job safety analysis (JSA) and safe work method statement (SWMS).
0135.E1.O4Calculate scaffolding and material requirements and incorporate into planning and preparation.
0135.E1.O5Determine expected loading on scaffold and supporting structure using load tables, and incorporate into planning and preparation.
0135.E1.O6Identify site access and egress routes and incorporate into planning and preparation.
0135.E1.O7Plan scaffolding task in accordance with workplace requirements.
