Licence to perform rigging intermediate level

KHU-CON-0192

Australian Equivalent
CPCCLRG3002
Elements
5
Learning Outcomes
25

This unit specifies the skills and knowledge required to safely perform intermediate rigging work. Riggers use mechanical load shifting equipment and associated gear to move, place or secure loads, including plant, equipment or members of a building or structure. Riggers ensure the stability of those members and set up and dismantle cranes and hoists. This unit includes rigging work involving: hoists with jibs and self-climbing hoists cranes, conveyors, dredges and excavators tilt slabs demolition of structures or plant multiple lifts. Rigging work is undertaken in construction and other industries where load shifting equipment is used to move, place or secure loads. Completion of the general construction induction training program, specified in the Safe Work Australia model Code of Practice: Construction Work, is required by anyone carrying out construction work. Achievement of CPCWHS10

Elements & Learning Outcomes

5
E1Plan task.
0192.E1.O1Review task instructions, consult with relevant persons to seek clarification as required, and obtain relevant workplace information.
0192.E1.O2Obtain and interpret information, including safe work method statements (SWMSs), required to ensure that activities are performed in compliance with workplace-specific and safe work requirements.
0192.E1.O3Obtain and interpret information required to ensure that equipment inspection, use, maintenance and storage complies with manufacturer requirements.
0192.E1.O4Identify workplace and task-specific hazards and determine required risk controls and safety measures and equipment, including signs and barricades, personal protective equipment (PPE), and fall prevention and fall arrest equipment.
0192.E1.O5Identify methods of moving and placing tools, equipment and materials to minimise the risk of falling objects, to avoid inappropriate carrying on ladders and to minimise hazardous manual tasks.
0192.E1.O6Identify required rigging equipment and associated gear.
0192.E1.O7Calculate loads associated with mechanical load shifting equipment and associated gear required to erect and dismantle structures and plant.
0192.E1.O8Establish required communication methods with relevant persons.
E2Select and inspect equipment.
0192.E2.O1Select risk controls and equipment, including fall prevention and fall arrest equipment, and check that it is working and fit for purpose.
0192.E2.O2Select and check PPE.
0192.E2.O3Select rigging equipment and associated gear, inspect for defects, and isolate, tag out, report and record defective items.
0192.E2.O4Select communication equipment and check that it is working and fit for use.
E3Set up task.
0192.E3.O1Establish and maintain communication with relevant persons to ensure task plan and risk controls are communicated clearly, including any impact on other workplace activities.
0192.E3.O2Ensure risk controls and safety measures and equipment have been put in place, including the fitting, adjusting and anchoring of fall protection equipment.
0192.E3.O3Consult with relevant persons to ensure that ground and foundation have been assessed as suitable for task.
0192.E3.O4Consult with relevant persons to ensure that the structure has been assessed as suitable for load bearing task.
E4Undertake intermediate rigging activities.
0192.E4.O1Erect and dismantle all structures and operate plant while maintaining stability, in accordance with workplace and manufacturer requirements.
0192.E4.O2Conduct a multiple-crane lift.
0192.E4.O3Erect and dismantle one of the following: a tower crane section or a crane lattice boom section, or a fly jib on a mobile slewing or a non-guyed tower crane.
0192.E4.O4Lift and install a series of tilt-up concrete panels.
0192.E4.O5Remove a concrete-encased structural steel column and beam.
E5Complete task.
0192.E5.O1Remove excess materials from work area.
0192.E5.O2Inspect structures, plant, equipment and gear for defects, and isolate, tag out and report defective items.
0192.E5.O3Store plant, equipment and gear in accordance with workplace requirements.
0192.E5.O4Remove risk controls and safety measures and equipment.
SEAL — South East Asia Learning Identifier & Skills Portal · Prepared for MLVT Executive approval and TVET institute review · Derived from the Australian National Training Register (training.gov.au, CC-BY) and aligned to the Cambodian Qualifications Framework and DSC Standard Training Packages · Delivered via Gibble SMS · July 2026