54
Sector Frameworks
1,164
Qualifications
15,161
Competency Units
10,938
Elements
41,782
Learning Outcomes
2,822
Assessment Packages

Licence to erect, alter and dismantle scaffolding advanced level

KHU-CON-0196

Australian Equivalent
CPCCLSF4001
Elements
5
Learning Outcomes
26

This unit specifies the skills and knowledge required to safely perform advanced scaffolding work. Scaffolding work involves erecting, altering or dismantling a temporary structure to support a platform from which a person or object could fall more than four metres. This unit applies to scaffolding work involving: cantilevered hoists hung scaffolds, including scaffolds hung from tubes, wire ropes or chains suspended scaffolds. Scaffolding work is undertaken in construction and other industries where temporary structures are erected, altered and dismantled. Completion of the general construction induction training program, specified in the Safe Work Australia model Code of Practice: Construction Work , is required by anyone carrying out construction work. Achievement of CPCWHS1001 Prepare to work safely in the construction industry meets this requirement. This unit has a pre-requisite req

Elements & Learning Outcomes

5
E1Plan task.
0196.E1.O1Review task instructions, consult with relevant persons to seek clarification as required, and obtain relevant workplace information.
0196.E1.O2Obtain and interpret information, including safe work method statements (SWMSs), required to ensure that activities are performed in compliance with workplace-specific and safe work requirements.
0196.E1.O3Obtain and interpret information required to ensure that equipment inspection, use, maintenance and storage complies with manufacturer requirements.
0196.E1.O4Identify workplace and task-specific hazards and determine required risk controls and safety measures and equipment, including signs and barricades, personal protective equipment (PPE), and fall prevention and fall arrest equipment.
0196.E1.O5Identify methods of moving and placing tools, equipment and materials to minimise the risk of falling objects, to avoid inappropriate carrying on ladders and to minimise hazardous manual tasks.
0196.E1.O6Identify required scaffold and associated equipment.
0196.E1.O7Calculate loads exerted on and by the scaffold and scaffolding equipment.
0196.E1.O8Establish required communication methods with relevant persons.
E2Select and inspect plant and equipment.
0196.E2.O1Select risk controls and equipment, including fall prevention and fall arrest equipment, and check that it is working and fit for purpose.
0196.E2.O2Select and check PPE.
0196.E2.O3Inspect scaffold and associated equipment for defects, and isolate, tag out, report and record defective items.
0196.E2.O4Select communication equipment and check that it is working and fit for use.
E3Set up task.
0196.E3.O1Establish and maintain communication with relevant persons to ensure task plan and risk controls are communicated clearly, including any impact on other workplace activities.
0196.E3.O2Ensure risk controls and safety measures and equipment have been put in place, including the fitting, adjusting and anchoring of fall protection equipment.
0196.E3.O3Consult with relevant persons to ensure that ground and foundation have been assessed as suitable for task.
0196.E3.O4Prepare footings to support scaffold and scaffold equipment.
0196.E3.O5Prepare scaffold and scaffold equipment, and place in a stable position ready for erection.
E4Undertake advanced scaffolding activities.
0196.E4.O1Erect and dismantle scaffold and equipment while maintaining stability, in accordance with workplace and manufacturer requirements.
0196.E4.O2Erect and dismantle a cantilevered hoist.
0196.E4.O3Erect and dismantle a hung scaffold that is hung from chains, flexible steel wire rope (FSWR) or tubes.
0196.E4.O4Erect and dismantle a suspended scaffold attached by a dual needle system using counterweights and powered winch.
E5Complete task.
0196.E5.O1Remove excess materials from work area.
0196.E5.O2Inspect completed scaffolding task for compliance with task requirements, complete handover certificate and forward to relevant persons, and complete and attach scaffold tag.
0196.E5.O3Inspect scaffold and scaffold equipment for defects, and isolate, tag out and report defective items.
0196.E5.O4Store scaffold and scaffold equipment in accordance with workplace requirements.
0196.E5.O5Remove risk controls and safety measures and equipment.
SEAL — South East Asia Learning Identifier & Skills Portal · Prepared for MLVT Executive approval and TVET institute review · Derived from the Australian National Training Register (training.gov.au, CC-BY) and aligned to the Cambodian Qualifications Framework and DSC Standard Training Packages · Delivered via Gibble SMS · July 2026