54
Sector Frameworks
1,164
Qualifications
15,161
Competency Units
10,938
Elements
41,782
Learning Outcomes
2,822
Assessment Packages

Fix standard plasterboard wall sheets

KHU-CON-0233

Australian Equivalent
CPCCPB3001
Elements
4
Learning Outcomes
18

This unit of competency specifies the skills and knowledge required to fix standard plasterboard wall sheets to comply with manufacturers’ and job specifications. A person working at this level would be expected to take responsibility for organising and completing tasks assigned to them without close supervision. Completion of the general construction induction training program specified by the model Code of Practice for Construction Work is required for any person who is to carry out construction work. Achievement of unit CPCWHS1001 Prepare to work safely in the construction industry meets this requirement. Licensing, legislative and/or certification requirements may apply to this unit in some states/territories.

Elements & Learning Outcomes

4
E1Plan and prepare.
0233.E1.O1Read and interpret work instructions, determine sign-off requirements, plan sequence of work and complete notifications.
0233.E1.O2Plan all work to comply with laws and regulations, the National Construction Code (NCC), Australian Standards, work health and safety (WHS) and environmental requirements, manufacturers’ specifications, and workplace requirements.
0233.E1.O3Select and use personal protective equipment (PPE) for each stage of the task.
0233.E1.O4Inspect work site, locate services, assess hazards and apply risk controls, including required signage and barricades.
0233.E1.O5Collect evidence that the carpenter has completed the substrate to be plaster ready.
0233.E1.O6Select tools and equipment, check for serviceability and report any faults that may affect the safe operation of the equipment, tag equipment and set aside.
0233.E1.O7Select materials required for task, including insulation, calculate quantities, handle safely and prepare and position ready for use.
E2Plan and cut wall sheets.
0233.E2.O1Determine work sequences, fixing processes and back blocking wall sheets from manufacturers’ specifications and AS/NZS2589 Gypsum linings - application and finishing.
0233.E2.O2Match sheet size to wall dimensions.
0233.E2.O3Plan cuts to locate joints over windows and doors to minimise effects of movement.
0233.E2.O4Plan cutting process to minimise dust exposure.
0233.E2.O5Mark cables without brackets as directed.
0233.E2.O6Follow manufacturers’ specifications for cutting process and provision for penetrations.
0233.E2.O7Cut sheets to minimise waste and number of joints, maximise board use, and leave openings for power points.
E3Fix standard wall sheets.
0233.E3.O1Hang and fix sheets using manual handling techniques and following manufacturers’ specifications, ensuring the sheets have appropriate gap from the floor.
0233.E3.O2Check work to ensure stop-up activities can be easily completed.
E4Clean up.
0233.E4.O1Clear work area and dispose of, reuse or recycle materials.
0233.E4.O2Clean, check, maintain and store tools and equipment in accordance with manufacturers’ specifications.
SEAL — South East Asia Learning Identifier & Skills Portal · Prepared for MLVT Executive approval and TVET institute review · Derived from the Australian National Training Register (training.gov.au, CC-BY) and aligned to the Cambodian Qualifications Framework and DSC Standard Training Packages · Delivered via Gibble SMS · July 2026