Install cast plaster blockwork and wall sheet panels

KHU-CON-0328

Australian Equivalent
CPCCSP3006
Elements
4
Learning Outcomes
17

This unit specifies the skills and knowledge required to set out and construct a wall by laying cast plaster blocks. A person working at this level would be expected to take responsibility for organising and completing tasks assigned to them, without close supervision. Completion of the general construction induction training program specified by the model Code of Practice for Construction Work is required for any person who is to carry out construction work. Achievement of unit CPCWHS1001 Prepare to work safely in the construction industry meets this requirement. No licensing, legislative or certification requirements apply to this unit at the time of publication.

Elements & Learning Outcomes

4
E1Plan and prepare to install plaster blockwork and wall sheet panels.
0328.E1.O1Read and interpret work instructions and plan sequence of work.
0328.E1.O2Plan all work to comply with laws and regulations, the National Construction Code (NCC), Australian Standards, work health and safety (WHS) and environmental requirements, manufacturers’ specifications, and workplace requirements.
0328.E1.O3Select and use personal protective equipment (PPE) for each stage of the task.
0328.E1.O4Inspect work site, assess hazards and apply risk controls, including required signage and barricades.
0328.E1.O5Select tools and equipment, check for serviceability and report any faults.
0328.E1.O6Select materials required for task, calculate quantities, handle safely and prepare and position ready for use.
E2Set out and prepare base for blockwork and wall sheet panels.
0328.E2.O1Clean base in preparation for first course.
0328.E2.O2Set out blockwork and panels to position, and prepare surface to be dry, horizontal and flat.
0328.E2.O3Set out position, gauge and bond of blockwork and panels to batten at specified fixing points.
E3Lay plaster blockwork and wall sheet panels.
0328.E3.O1Prepare adhesives to required consistency and quantity to manufacturers’ specifications.
0328.E3.O2Lay base course to set out line.
0328.E3.O3Install blockwork/wall sheet panels and vertical abutments level, plumb and straight.
0328.E3.O4Maintain bond and gauge to the set out height and width.
0328.E3.O5Remove surplus adhesive and clean blocks.
0328.E3.O6Apply solid plaster and finish to requirements.
E4Clean up.
0328.E4.O1Clear work area, dispose of materials, and reuse or recycle in compliance with legislation, regulations and codes of practice.
0328.E4.O2Clean, check, maintain and store tools and equipment in accordance with manufacturers’ specifications.
SEAL — South East Asia Learning Identifier & Skills Portal · Prepared for MLVT Executive approval and TVET institute review · Derived from the Australian National Training Register (training.gov.au, CC-BY) and aligned to the Cambodian Qualifications Framework and DSC Standard Training Packages · Delivered via Gibble SMS · July 2026