MLVT
SKILLS PORTAL
ព្រះរាជាណាចក្រកម្ពុជា · KINGDOM OF CAMBODIA

Cambodian Skills Delivery Model

SEAL National Course Catalogue · MLVT / National Training Board
អត្តសញ្ញាណប័ណ្ណសិក្សាអាស៊ីអាគ្នេយ៍ការរៀនសូត្រពេញមួយជីវិត • អធិបតេយ្យដោយការរចនាSEALSOUTH EAST ASIA LEARNING IDENTIFIERកម្ពុជា២០២៦
54
Sector Frameworks
1,164
Qualifications
15,161
Competency Units
10,938
Elements
41,782
Learning Outcomes
2,822
Assessment Packages

Plan monument construction

KHU-CON-0345

Australian Equivalent
CPCCST3011
Elements
3
Learning Outcomes
13

This unit specifies the skills and knowledge required to prepare plans and specifications for the construction phase of monuments in cemeteries. It includes identifying and meeting customer needs and state and local legislative requirements. This unit applies to stonemasons who work independently, in a team or under supervision to plan monument construction relating to stonemasonry work in a workshop setting, on a new or existing structure. A person working at this level would be expected to take responsibility for organising and completing tasks assigned to them without needing close supervision. Completion of the general construction induction training program specified by the model Code of Practice for Construction Work is required for any person who is to carry out construction work. Achievement of CPCWHS1001 Prepare to work safely in the construction industry meets this requirement.

Elements & Learning Outcomes

3
E1Identify design and legislative requirements.
0345.E1.O1Read, interpret and apply relevant information, government legislation, standards and codes appropriate to monument construction in cemeteries.
0345.E1.O2Follow relevant information from workplace procedures, workplace safety and environmental documentation.
0345.E1.O3Determine monument design and materials with customer.
0345.E1.O4Check selected materials conform to proposed design.
0345.E1.O5Select and check drawing equipment is sufficient for job design.
E2Prepare plans.
0345.E2.O1Determine job priorities, time frames and sequence job tasks in consultation with others.
0345.E2.O2Design foundation details according to soil type and monument size.
0345.E2.O3Design monument to meet the client’s requirements.
0345.E2.O4Check design with client for approval.
E3Finalise design and specifications for submission.
0345.E3.O1Complete drawings applying drafting conventions and detailing joining, supporting and reinforcing requirements.
0345.E3.O2Compile specifications ensuring direct relationship with drawings and regulations.
0345.E3.O3Check drawing and specifications and edit for consistency.
0345.E3.O4Print drawings and specifications in preparation for distribution.
SEAL — South East Asia Learning Identifier & Skills Portal · Prepared for MLVT Executive approval and TVET institute review · Derived from the Australian National Training Register (training.gov.au, CC-BY) and aligned to the Cambodian Qualifications Framework and DSC Standard Training Packages · Delivered via Gibble SMS · July 2026