MLVT
SKILLS PORTAL
ព្រះរាជាណាចក្រកម្ពុជា · KINGDOM OF CAMBODIA

Cambodian Skills Delivery Model

SEAL National Course Catalogue · MLVT / National Training Board
អត្តសញ្ញាណប័ណ្ណសិក្សាអាស៊ីអាគ្នេយ៍ការរៀនសូត្រពេញមួយជីវិត • អធិបតេយ្យដោយការរចនាSEALSOUTH EAST ASIA LEARNING IDENTIFIERកម្ពុជា២០២៦
54
Sector Frameworks
1,164
Qualifications
15,161
Competency Units
10,938
Elements
41,782
Learning Outcomes
2,822
Assessment Packages

Apply waterproofing for wall and floor tiling

KHU-CON-0387

Australian Equivalent
CPCCWF3009
Elements
4
Learning Outcomes
18

This unit specifies the skills and knowledge required to apply waterproofing to internal and external wet areas ready for tiling. It includes identification of the appropriate waterproofing system to be used, its preparation and application. A person working at this level would be expected to take responsibility for organising and completing tasks assigned to them without close supervision. Completion of the general construction induction training program specified by the model Code of Practice for Construction Work is required for any person who is to carry out construction work. Achievement of CPCWHS1001 Prepare to work safely in the construction industry meets this requirement. No licensing, legislative or certification requirements apply to this unit at the time of publication.

Elements & Learning Outcomes

4
E1Plan and prepare to apply waterproofing for wall and floor tiling.
0387.E1.O1Read and interpret task work instructions and plan sequence of work.
0387.E1.O2Select and use personal protective equipment (PPE) as required for each stage of the task.
0387.E1.O3Plan all work to comply with laws and regulations, Australian Standards, work health and safety (WHS) and environmental requirements, manufacturers’ specifications, workplace requirements, drawings and specifications.
0387.E1.O4Inspect work site, assess hazards and apply risk controls, including required signage and barricades.
0387.E1.O5Select tools and equipment, check for serviceability and report any faults.
0387.E1.O6Select materials required for task, calculate quantities, handle safely and prepare and position ready for use.
E2Prepare for internal and external waterproofing installation.
0387.E2.O1Check wet area outlets and fixtures are set out to drawings and specifications.
0387.E2.O2Select waterproofing systems suitable for internal and external wet area applications.
0387.E2.O3Check waterproof system for compatibility with substrate material and tiling system.
0387.E2.O4Check that substrates have smooth and uniform finishes with specified fall ratio to drainage points.
0387.E2.O5Check substrate moisture content to comply with manufacturers’ membrane recommendations.
E3Apply waterproofing.
0387.E3.O1Prepare and prime substrates for waterproofing.
0387.E3.O2Install bond breakers/fillets, water stops and drainage flanges.
0387.E3.O3Apply waterproofing membrane to primed surface at correct thickness and allow to cure to manufacturers' specification.
0387.E3.O4Perform final inspection and completion activities.
0387.E3.O5Protect waterproofing membrane.
E4Clean up.
0387.E4.O1Clear work area and dispose of, reuse or recycle materials.
0387.E4.O2Clean, check, maintain and store plant, tools and equipment in accordance with manufacturers’ recommendations.
SEAL — South East Asia Learning Identifier & Skills Portal · Prepared for MLVT Executive approval and TVET institute review · Derived from the Australian National Training Register (training.gov.au, CC-BY) and aligned to the Cambodian Qualifications Framework and DSC Standard Training Packages · Delivered via Gibble SMS · July 2026