Inspect the erection of prefabricated concrete elements

KHU-CON-0530

Australian Equivalent
CPCPRE4001
Elements
3
Learning Outcomes
15

This unit of competency specifies the skills and knowledge required to inspect the erection of prefabricated concrete elements on a construction site. It includes the inspection of safe work practices during the erection and temporary support of prefabricated concrete elements and the inspection of the erected elements. It requires overseeing the use of plant, tools and equipment appropriate for the installation of prefabricated concrete elements and associated structural components, including temporary supports (propping and bracing), temporary and permanent connections, grouting, and vertical and horizontal joints. Completion of the general construction induction training program, specified in the Safe Work Australia model Code ofPractice: Construction Work, is required by anyone carrying out construction work. Achievement of CPCWHS1001 Prepare to work safely in the construction indust

Elements & Learning Outcomes

3
E1Prepare to inspect the erection of prefabricated concrete elements.
0530.E1.O1Check the prefabricated concrete element records to ascertain progress and prepare for the physical inspection of the prefabricated concrete elements.
0530.E1.O2Check prefabricated concrete element records to ensure that safe systems of work and safe work practices have been enforced and followed.
0530.E1.O3Check prefabricated concrete element manufacturing and inspection records to confirm design specifications have been followed in accordance with AS 3850 Prefabricated concrete elements during manufacture, storage, lifting and handling through to installation and final fixing.
E2Conduct inspection of the erection of prefabricated concrete elements.
0530.E2.O1Inspect safety systems and ensure that workers and contractors are following safety requirements during the erection of the prefabricated concrete elements.
0530.E2.O2Inspect placement and storage arrangements of prefabricated concrete elements onsite and ensure they conform to the erection documentation as detailed in AS 3850 Prefabricated concrete elements.
0530.E2.O3Inspect processes to ensure erection areas are cleared, exclusion zones set up, barriers erected, and site personnel advised of restricted access areas prior to erection of prefabricated concrete elements.
0530.E2.O4Inspect and confirm that fixings supplied for attachments to the permanent structure and for temporary supports comply with the requirements of the erection documentation approved by relevant personnel, AS 3850 Prefabricated concrete elements and the project specifications.
0530.E2.O5Inspect and confirm that temporary supports, dowels and shims are correctly placed, and components positioned in accordance with the erection documentation as detailed in AS 3850 Prefabricated concrete elements and project specifications.
E3Inspect prefabricated concrete element stability.
0530.E3.O1Inspect and confirm that the erected prefabricated concrete elements comply with the erection documentation approved by relevant personnel as detailed in AS 3850 Prefabricated concrete elements and engineering specifications.
0530.E3.O2Inspect and confirm that fixtures between structural steel components and temporarily supported elements comply with the erection documentation approved by relevant personnel and as detailed in AS 3850 Prefabricated concrete elements and engineering specifications.
0530.E3.O3Inspect and confirm that all grouting, including breathers and grout tubes, are sufficiently filled and gained suitable strength.
0530.E3.O4Ensure that temporary supports are removed and/or moved, re-positioned or replaced only with the written approval of the project design engineer in accordance with AS 3850 Prefabricated concrete elements.
0530.E3.O5Oversee the safe removal of temporary bracing, plant and equipment from site.
0530.E3.O6Check if damage has occurred and if so, identify and consult the appropriate person to arrange for repair.
0530.E3.O7Inspect the completion of the erection work and clearing and cleaning of work areas prior to other trades being permitted to enter work zones.
SEAL — South East Asia Learning Identifier & Skills Portal · Prepared for MLVT Executive approval and TVET institute review · Derived from the Australian National Training Register (training.gov.au, CC-BY) and aligned to the Cambodian Qualifications Framework and DSC Standard Training Packages · Delivered via Gibble SMS · July 2026