Investigate and prepare swimming pool site

KHU-CON-0587

Australian Equivalent
CPCSPS4001
Elements
4
Learning Outcomes
17

This unit specifies the skills and knowledge required to prepare a site for swimming pool construction. It includes investigating the site to confirm site levels and pool height and supervising the excavation. This unit applies to a range of contexts and reflects the role of those who are responsible for preparing sites for the installation or construction of: private swimming pools public swimming pools, including: hydrotherapy and therapeutic exercise pools wading and receiving pools associated with water slides wave pools. This unit is suitable for those using specialised knowledge to complete routine and non-routine tasks, and their own judgement to deal with predictable and sometimes unpredictable problems. No licensing or certification requirements apply to this unit at the time of publication.

Elements & Learning Outcomes

4
E1Evaluate site conditions.
0587.E1.O1Read and interpret relevant site and swimming pool construction information from plans, specifications, codes and standards.
0587.E1.O2Interpret and apply work health and safety and environmental requirements.
0587.E1.O3Evaluate site access, delivery service requirements and space for storage of materials.
0587.E1.O4Apply relevant WHS regulations and codes when locating and preparing for work near existing underground and overhead services.
0587.E1.O5Assess and resolve site issues that may impact pool construction.
0587.E1.O6Calculate amount of excavation spoil and plan the removal.
E2Prepare site for pool excavation.
0587.E2.O1Prepare procedures for onsite and public safety during project work.
0587.E2.O2Design site access and egress and arrange temporary site fencing.
0587.E2.O3Set out pool position, finish height of pool and depth of excavation from Australian Height Datum (AHD).
0587.E2.O4Organise plant, machinery and equipment for the excavation process.
E3Coordinate and manage excavation.
0587.E3.O1Check local government and certifier approval and detail drawings to confirm structural requirements.
0587.E3.O2Oversee the excavation process ensuring adherence to plan specifications and safety requirements.
0587.E3.O3Examine soil stability and take necessary steps to avoid soil collapse.
0587.E3.O4Verify soil compaction complies with soil test report, standards and codes.
E4Prepare site for pool construction.
0587.E4.O1Oversee the removal of excess soil and cleaning of public areas.
0587.E4.O2Prepare site for delivery of swimming pool construction materials.
0587.E4.O3Complete necessary documentation and notify relevant person of next stage of pool construction.
SEAL — South East Asia Learning Identifier & Skills Portal · Prepared for MLVT Executive approval and TVET institute review · Derived from the Australian National Training Register (training.gov.au, CC-BY) and aligned to the Cambodian Qualifications Framework and DSC Standard Training Packages · Delivered via Gibble SMS · July 2026