Install prefabricated fibreglass swimming pools

KHU-CON-0591

Australian Equivalent
CPCSPS4005
Elements
3
Learning Outcomes
16

This unit specifies the skills and knowledge required to install variously shaped in-ground prefabricated fibreglass swimming pools. It includes preparing for filtration and circulation systems and luminary bonding for equipment and lighting. This unit applies to a range of contexts and reflects the role of those who are responsible for the installation process and the management of excavation and heavy lifting equipment to complete the installation of prefabricated fibreglass: private swimming pools public swimming pools, including: hydrotherapy and therapeutic exercise pools wading and receiving pools associated with water slides wave pools. This unit is suitable for those using specialised knowledge to complete routine and non-routine tasks, and their own judgement to deal with predictable and sometimes unpredictable problems. No licensing or certification requirements apply to this u

Elements & Learning Outcomes

3
E1Plan installation of prefabricated fibreglass swimming pool.
0591.E1.O1Access, read and interpret relevant information from plans, specifications, codes and standards.
0591.E1.O2Interpret and apply work health and safety and environmental requirements.
0591.E1.O3Identify and confirm with client type and location of filtration and circulation system and lighting requirements.
0591.E1.O4Calculate and order materials and components.
0591.E1.O5Determine commencement date and schedule delivery of material and components and required plant and equipment.
0591.E1.O6Apply relevant WHS regulations and codes when locating and preparing for work near existing underground and overhead services.
0591.E1.O7Determine job priorities and sequence job tasks in consultation with others on site.
0591.E1.O8Select, fit and use personal protective equipment appropriate to activity.
E2Install prefabricated fibreglass swimming pool.
0591.E2.O1Set out and mark pool position, finish height and excavation depth.
0591.E2.O2Excavate to set out depth and side clearance, allowing for backfill.
0591.E2.O3Select and prepare base in accordance with soil classifications of site.
0591.E2.O4Confirm installation of circulation pipework to shell of swimming.
0591.E2.O5Confirm and implement requirements for managing traffic during pool installation.
0591.E2.O6Communicate with crane service provider to lift, position and set shell to the specified level.
E3Clean up site.
0591.E3.O1Clear the work area and reuse, recycle or dispose of materials in accordance with workplace and environmental requirements.
0591.E3.O2Clean tools and equipment, check for serviceability, report any damage or faults and store and secure.
SEAL — South East Asia Learning Identifier & Skills Portal · Prepared for MLVT Executive approval and TVET institute review · Derived from the Australian National Training Register (training.gov.au, CC-BY) and aligned to the Cambodian Qualifications Framework and DSC Standard Training Packages · Delivered via Gibble SMS · July 2026