0353.E1.O1Customer requirements for scenes, events and controls in an integrated system are determined from job specifications and appropriate person/s

SKILLS PORTAL
ព្រះរាជាណាចក្រកម្ពុជា · KINGDOM OF CAMBODIA
Cambodian Skills Delivery Model
SEAL National Course Catalogue · MLVT / National Training Board
54
Sector Frameworks
1,164
Qualifications
15,161
Competency Units
10,938
Elements
41,782
Learning Outcomes
2,822
Assessment Packages
Plan the electrical installation of integrated systems
KHU-ELT-0353
Australian Equivalent
UEEIC0024
Elements
3
Learning Outcomes
3
This unit involves the skills and knowledge required to plan the electrical installation of integrated system. It includes implementing integrated system scenario and installation by determining bus system parameters, topology and installation requirements, bus system cables and terminations, control and dimming methods; and planning and documenting integrated installation plan. A network topology is the arrangement of a network, including its nodes and connecting lines. In a bus network topology, every workstation is connected to a main cable called the bus. No licensing, legislative or certification requirements apply to this unit at the time of publication.
Elements & Learning Outcomes
30353.E2.O1Hazards are identified, risks assessed and control measures implemented
0353.E3.O1Work health and safety (WHS)/occupational health and safety (OHS) risk control work measures and workplace procedures are followed