MLVT
SKILLS PORTAL
ព្រះរាជាណាចក្រកម្ពុជា · KINGDOM OF CAMBODIA

Cambodian Skills Delivery Model

SEAL National Course Catalogue · MLVT / National Training Board
អត្តសញ្ញាណប័ណ្ណសិក្សាអាស៊ីអាគ្នេយ៍ការរៀនសូត្រពេញមួយជីវិត • អធិបតេយ្យដោយការរចនាSEALSOUTH EAST ASIA LEARNING IDENTIFIERកម្ពុជា២០២៦
54
Sector Frameworks
1,164
Qualifications
15,161
Competency Units
10,938
Elements
41,782
Learning Outcomes
2,822
Assessment Packages

Disconnect - reconnect electrical equipment connected to low voltage (LV) installation wiring

KHU-ELT-0529

Australian Equivalent
UEERL0004
Elements
6
Learning Outcomes
6

This unit involves the skills and knowledge required to disconnect and reconnect electrical equipment connected to low voltage (LV) installation wiring. It includes preparing electrical equipment for disconnecting and then reconnecting equipment connected to LV installation wiring. It also includes inspecting and testing the reconnected electrical equipment for safe operation, identifying and reporting electrical faults and providing status reports. This must be incidental to a primary or regular function of the workplace. The unit excludes disconnecting or reconnecting circuits at a switchboard or to general electrical accessories (including switches, socket outlets and circuit protective devices), or installation of or alteration to any part of the fixed electrical wiring system (defined as electrical installation work). The skills and knowledge described in this unit require a licence

Elements & Learning Outcomes

6
E1Prepare to disconnect electrical equipment
0529.E1.O1Electrical equipment disconnection is planned to ensure WHS/OHS policies and procedures are followed
E2Disconnect electrical equipment
0529.E2.O1WHS/OHS policies and workplace procedures are followed
E3Prepare to reconnect electrical equipment
0529.E3.O1Reconnection is planned to ensure WHS/OHS policies and workplace procedures are followed
E4Reconnect electrical equipment
0529.E4.O1WHS/OHS policies and procedures are followed
E5Test the reconnected electrical equipment for safe operation
0529.E5.O1WHS/OHS policies and workplace procedures for the reinstatement of isolated circuits and electrical equipment is followed
E6Complete compliance documentation
0529.E6.O1Equipment status report/s are completed and relevant person/s notified in accordance with task requirements and workplace procedures
SEAL — South East Asia Learning Identifier & Skills Portal · Prepared for MLVT Executive approval and TVET institute review · Derived from the Australian National Training Register (training.gov.au, CC-BY) and aligned to the Cambodian Qualifications Framework and DSC Standard Training Packages · Delivered via Gibble SMS · July 2026