Lesson 2.1 — Measuring & Marking Out

The manual's bench-work module begins where every good job begins: measurement. You will use the steel rule, tape, try square, scriber, centre punch and spirit level. The rule of the trade is measure twice, cut once — a conduit run marked 5 mm off at the board ends 50 mm off at the far wall. Marking out for electrical work means level lines for switch heights (typically 1.2 m), socket heights (0.3–0.4 m) and straight, plumb conduit runs.

Key points

  • Steel rule for short, tape for long, square for 90°
  • Centre punch every hole before drilling — the bit will not wander
  • Spirit level on every horizontal run; plumb line on every drop
SEAL — South East Asia Learning Identifier & Skills Portal · Prepared for MLVT Executive approval and TVET institute review · Derived from the Australian National Training Register (training.gov.au, CC-BY) and aligned to the Cambodian Qualifications Framework and DSC Standard Training Packages · Delivered via Gibble SMS · July 2026