Lesson 3.3 — Wiring the Power Room

Connection order protects equipment and installer: battery to controller FIRST (controller learns system voltage), then panels to controller, then inverter directly to battery through its own fuse — never through the controller's load terminals. Batteries sit in a ventilated box off the floor; lead-acid vents hydrogen, so no sparks, no smoking, terminals covered. Fuse every battery positive within 30 cm of the terminal.

Reversing battery polarity kills controllers and inverters instantly — check twice, connect once.

Evidence task

Upload photos of your completed power-room wiring with labels visible.

SEAL — South East Asia Learning Identifier & Skills Portal · Prepared for MLVT Executive approval and TVET institute review · Derived from the Australian National Training Register (training.gov.au, CC-BY) and aligned to the Cambodian Qualifications Framework and DSC Standard Training Packages · Delivered via Gibble SMS · July 2026