Erect and dismantle formwork for footings and slabs on ground

KHU-CON-0128

Australian Equivalent
CPCCCA3028
Elements
4
Learning Outcomes
18

This unit of competency specifies the skills and knowledge required to erect and dismantle formwork for slabs on ground, rebates to slabs on ground, and steps to strip footings, meeting all relevant requirements of the National Construction Code (NCC), Australian Standards, work health and safety (WHS), and Commonwealth and state or territory legislation. The unit includes: establishing required levels on site and constructing formwork using boxing materials, including timber, metal, masonry, fibre cement sheeting or reconstituted timber products, and fixings to contain wet poured concrete until it is completely cured stripping the formwork and preparing and storing it for re-use. Completion of the general construction induction training program specified by the model Code of Practice for Construction Work is required for any person who is to carry out construction work. Achievement of C

Elements & Learning Outcomes

4
E1Plan and prepare.
0128.E1.O1Read and interpret work instructions and plan sequence of work.
0128.E1.O2Plan all work to comply with laws and regulations, the National Construction Code (NCC), Australian Standards, work health and safety (WHS) and environmental requirements, manufacturers’ specifications, workplace requirements, drawings and specifications.
0128.E1.O3Select tools and equipment, check for serviceability and report any faults.
0128.E1.O4Select and use personal protective equipment (PPE) for each part of the task.
0128.E1.O5Inspect work site, locate services, assess hazards and apply risk controls, including required signage and barricades.
0128.E1.O6Select materials required for task, calculate quantities, handle safely and prepare and position ready for use.
E2Erect formwork.
0128.E2.O1Clear work area and prepare surface for safe erection of formwork.
0128.E2.O2Measure, set out and level formwork.
0128.E2.O3Apply fixing and fasteners to ensure stable formwork construction.
0128.E2.O4Construct and erect edge rebate.
0128.E2.O5Check and brace formwork for accuracy of square and dimension.
0128.E2.O6Install block-outs and cast-in services to specified locations.
0128.E2.O7Apply release agent to formwork face following manufacturers’ specifications.
E3Strip formwork and prepare for reuse.
0128.E3.O1Strip edge boxing and bracing support sequentially and safely.
0128.E3.O2Check formwork for re-usability and dispose of damaged components to meet safety and environmental requirements.
0128.E3.O3Safely de-nail, clean, oil and store or stack reusable formwork components.
E4Clean up.
0128.E4.O1Clean up, meeting all legislative and workplace requirements for safety, waste disposal and materials handling.
0128.E4.O2Check, maintain and store tools and equipment and report any faults.
SEAL — South East Asia Learning Identifier & Skills Portal · Prepared for MLVT Executive approval and TVET institute review · Derived from the Australian National Training Register (training.gov.au, CC-BY) and aligned to the Cambodian Qualifications Framework and DSC Standard Training Packages · Delivered via Gibble SMS · July 2026