MLVT
SKILLS PORTAL
ព្រះរាជាណាចក្រកម្ពុជា · KINGDOM OF CAMBODIA

Cambodian Skills Delivery Model

SEAL National Course Catalogue · MLVT / National Training Board
អត្តសញ្ញាណប័ណ្ណសិក្សាអាស៊ីអាគ្នេយ៍ការរៀនសូត្រពេញមួយជីវិត • អធិបតេយ្យដោយការរចនាSEALSOUTH EAST ASIA LEARNING IDENTIFIERកម្ពុជា២០២៦
54
Sector Frameworks
1,164
Qualifications
15,161
Competency Units
10,938
Elements
41,782
Learning Outcomes
2,822
Assessment Packages

Certificate III in Carpentry

KHQ-CON3-003 · Delivery Course: KHC-CON3-003

Level 3 · Technical Certificate 2FULL DEPTHMLVT STANDARD EXISTS
Australian Equivalent
CPC30220Certificate III in Carpentry
AQF Equivalent
Certificate III
AU Release
6
DSC
CBC · DSC-1-3 Formwork installation; DSC-1-4 Finishing carpentry / joinery installatio
This is a trade qualification for carpenters in residential and commercial workplaces. It includes setting out, manufacturing, constructing, assembling, installing and repairing products made using timber and non-timber materials. Occupational titles may include: Carpenter - Commercial Carpenter - Formwork Carpenter - Residential State and territory jurisdictions may have different licensing, legislative, regulatory or certification requirements. Relevant state and territory regulatory authorities should be consulted to confirm those requirements. Completion of the general construction induction training program, specified in the Safe Work Australia model Code of Practice: Construction Work , is required by anyone carrying out construction work. Achievement of CPCWHS1001 Prepare to work safely in the construction industry meets this requirement. This qualification is suitable for an Australian apprenticeship pathway.
Entry Requirements

There are no entry requirements for this qualification.

Packaging Rules

To achieve this qualification, competency must be demonstrated in: 34 units of competency: 27 core units 7 electives a minimum of five units must be selected from Group A the remaining can be selected from Group A or Group B a maximum of two units can be selected from any group or current training package, as long as it contributes to a valid, industry-supported vocational outcome and maintains the AQF level of this qualification. Prerequisite units of competency An asterisk (*) against a unit code below indicates that there is a prerequisite requirement that must be met. Prerequisite unit(s) must be assessed before assessment of any unit of competency with an asterisk. Check the unit of competency for information on specific prerequisite requirements. All prerequisite requirements are packaged in the qualification. Core Units CPCCCA2002 * Use carpentry tools and equipment CPCCCA2011 * Handle carpentry materials CPCCCA3001 * Carry out general demolition of minor building structures CPCCCA3002 * Carry out setting out CPCCCA3003 * Install flooring systems CPCCCA3004 * Construct and erect wall frames CPCCCA3005 * Construct ceiling frames CPCCCA3006 * Erect roof trusses CPCCCA3007 * Construct pitched roofs CPCCCA3008 * Construct eaves CPCCCA3010 * Install windows and doors CPCCCA3016 * Construct, assemble and install timber external stairs CPCCCA3017 * Install exterior cladding CPCCCA3024 * Install lining, panelling and moulding CPCCCA3025 * Read and interpret plans, specifications and drawings for carpentry work CPCCCA3028 * Erect and dismantle formwork for footings and slabs on ground CPCCCM2006 Apply basic levelling procedures CPCCCM2008 * Erect and dismantle restricted height scaffolding CPCCCM2012 * Work safely at heights CPCCCO2013 * Carry out concreting to simple forms CPCCOM1012 Work effectively and sustainably in the construction industry CPCCOM1014 Conduct workplace communication CPCCOM1015 Carry out measurements and calculations CPCCOM3001 Perform construction calculations to determine carpentry material requirements CPCCOM3006 Carry out levelling operations CPCCWHS2001 Apply WHS requirements, policies and procedures in the construction industry CPCWHS3001 Identify construction work hazards and select risk control strategies Group A - Specialist Electives CPCCCA3009 * Construct advanced roofs CPCCCA3012 * Frame and fit wet area fixtures CPCCCA3014 * Construct and install bulkheads CPCCCA3018 * Construct, erect and dismantle formwork for stairs and ramps CPCCCA3019 * Erect and dismantle formwork to suspended slabs, columns, beams and walls CPCCCA3020 * Erect and dismantle jump-form formwork CPCCCA3022 * Install curtain walling CPCCCA3027 * Set up, operate and maintain indirect action powder-actuated power tools CPCCCM2002 * Carry out hand excavation CPCCCM3001 Operate elevated work platforms up to 11 metres CPCCJN3003 * Manufacture components for doors, windows and frames CPCCJN3004 * Manufacture and assemble joinery components CPCCJN3100 * Process materials to produce components using static machines CPCCON3048 * Construct tilt panels on site CPCCSF2004 * Place and fix reinforcement materials CPCCWC3003 * Install dry wall passive fire-rated systems CPCCWC3004 * Install suspended ceilings Group B - General Electives CPCCCA3011 * Refurbish timber sashes to window frames CPCCCA3026 * Assemble partitions CPCCCM3005 Calculate costs of construction work CPCCLSF2001 License to erect, alter and dismantle scaffolding basic level CPCCOM1013 Plan and organise work CPCCPB3001 * Fix standard plasterboard wall sheets CPCCPB3002 * Fix standard plasterboard ceiling sheets CPCCSF2005 * Arc weld reinforcement steel CPCCSF3002 * Carry out monostrand post-tensioning CPCCSF3003 * Carry out multistrand post-tensioning CPCCSF3004 * Carry out stressbar post-tensioning CPCCST4001 Prepare to undertake the heritage restoration process CPCCST4002 Undertake the heritage restoration process CPCPCM2043 Carry out WHS requirements CPCPCM2052 * Weld mil

Units packaged in this qualification

60
KHU-CON-0103Use carpentry tools and equipmentAU: CPCCCA2002KHU-CON-0104Handle carpentry materialsAU: CPCCCA2011KHU-CON-0105Carry out general demolition of minor building structuresAU: CPCCCA3001KHU-CON-0106Carry out setting outAU: CPCCCA3002KHU-CON-0107Install flooring systemsAU: CPCCCA3003KHU-CON-0108Construct and erect wall framesAU: CPCCCA3004KHU-CON-0109Construct ceiling framesAU: CPCCCA3005KHU-CON-0110Erect roof trussesAU: CPCCCA3006KHU-CON-0111Construct pitched roofsAU: CPCCCA3007KHU-CON-0112Construct eavesAU: CPCCCA3008KHU-CON-0114Install windows and doorsAU: CPCCCA3010KHU-CON-0118Construct, assemble and install timber external stairsAU: CPCCCA3016KHU-CON-0119Install exterior claddingAU: CPCCCA3017KHU-CON-0124Install lining, panelling and mouldingAU: CPCCCA3024KHU-CON-0125Read and interpret plans, specifications and drawings for carpentry workAU: CPCCCA3025KHU-CON-0128Erect and dismantle formwork for footings and slabs on groundAU: CPCCCA3028KHU-CON-0133Apply basic levelling proceduresAU: CPCCCM2006KHU-CON-0135Erect and dismantle restricted height scaffoldingAU: CPCCCM2008KHU-CON-0138Work safely at heightsAU: CPCCCM2012KHU-CON-0145Carry out concreting to simple formsAU: CPCCCO2013KHU-CON-0199Work effectively and sustainably in the construction industryAU: CPCCOM1012KHU-CON-0201Conduct workplace communicationAU: CPCCOM1014KHU-CON-0202Carry out measurements and calculationsAU: CPCCOM1015KHU-CON-0206Perform construction calculations to determine carpentry material requirementsAU: CPCCOM3001KHU-CON-0207Carry out levelling operationsAU: CPCCOM3006KHU-CON-0388Apply WHS requirements, policies and procedures in the construction industryAU: CPCCWHS2001KHU-CON-0605Identify construction work hazards and select risk control strategiesAU: CPCWHS3001KHU-CON-0113Construct advanced roofsAU: CPCCCA3009KHU-CON-0116Frame and fit wet area fixturesAU: CPCCCA3012KHU-CON-0117Construct and install bulkheadsAU: CPCCCA3014KHU-CON-0120Construct, erect and dismantle formwork for stairs and rampsAU: CPCCCA3018KHU-CON-0121Erect and dismantle formwork to suspended slabs, columns, beams and wallsAU: CPCCCA3019KHU-CON-0122Erect and dismantle jump form formworkAU: CPCCCA3020KHU-CON-0123Install curtain wallingAU: CPCCCA3022KHU-CON-0127Set up, operate and maintain indirect action powder-actuated power toolsAU: CPCCCA3027KHU-CON-0130Carry out hand excavationAU: CPCCCM2002KHU-CON-0140Operate elevated work platforms up to 11 metresAU: CPCCCM3001KHU-CON-0177Manufacture components for doors, windows and framesAU: CPCCJN3003KHU-CON-0178Manufacture and assemble joinery componentsAU: CPCCJN3004KHU-CON-0180Process materials to produce components using static machinesAU: CPCCJN3100KHU-CON-0218Construct tilt panels on siteAU: CPCCON3048KHU-CON-0294Place and fix reinforcement materialsAU: CPCCSF2004KHU-CON-0375Install dry wall passive fire-rated systemsAU: CPCCWC3003KHU-CON-0376Install suspended ceilingsAU: CPCCWC3004KHU-CON-0115Refurbish timber sashes to window framesAU: CPCCCA3011KHU-CON-0126Assemble partitionsAU: CPCCCA3026KHU-CON-0144Calculate costs of construction workAU: CPCCCM3005KHU-CON-0194Licence to erect, alter and dismantle scaffolding basic levelAU: CPCCLSF2001KHU-CON-0200Plan and organise workAU: CPCCOM1013KHU-CON-0233Fix standard plasterboard wall sheetsAU: CPCCPB3001KHU-CON-0234Fix standard plasterboard ceiling sheetsAU: CPCCPB3002KHU-CON-0295Arc weld reinforcement steelAU: CPCCSF2005KHU-CON-0299Carry out monostrand post-tensioningAU: CPCCSF3002KHU-CON-0300Carry out multistrand post-tensioningAU: CPCCSF3003KHU-CON-0301Carry out stressbar post-tensioningAU: CPCCSF3004KHU-CON-0360Prepare to undertake the heritage restoration processAU: CPCCST4001KHU-CON-0361Undertake the heritage restoration processAU: CPCCST4002KHU-CON-0408Carry out WHS requirementsAU: CPCPCM2043KHU-CON-0414Weld mild steel using oxy-acetylene equipmentAU: CPCPCM2052KHU-CON-0415Weld using metal arc welding equipmentAU: CPCPCM2053
SEAL — South East Asia Learning Identifier & Skills Portal · Prepared for MLVT Executive approval and TVET institute review · Derived from the Australian National Training Register (training.gov.au, CC-BY) and aligned to the Cambodian Qualifications Framework and DSC Standard Training Packages · Delivered via Gibble SMS · July 2026