0234.E1.O1Read and interpret work instructions, determine sign-off requirements for plaster-ready background, plan sequence of work and complete notifications.
0234.E1.O2Plan all work to comply with laws and regulations, the National Construction Code (NCC), Australian Standards, work health and safety (WHS) and environmental requirements, manufacturers’ specifications, and workplace requirements.
0234.E1.O3Select and use personal protective equipment (PPE) for each stage of the task.
0234.E1.O4Inspect work site, locate services, assess hazards and apply risk controls, including required signage and barricades.
0234.E1.O5Collect evidence that the carpenter has completed the substrate to be plaster ready.
0234.E1.O6Select tools and equipment, check for serviceability and report any faults that may affect the safe operation of the equipment, tag equipment and set aside.
0234.E1.O7Select materials required for task, including insulation, calculate quantities, handle safely and prepare and position ready for use.