Grout prefabricated concrete elements

KHU-CON-0526

Australian Equivalent
CPCPRE2003
Elements
6
Learning Outcomes
26

This unit of competency specifies the skills and knowledge required to grout load bearing and non-load bearing prefabricated concrete elements according to specified requirements. It requires using tools and equipment appropriate for grouting. A person who has achieved this unit of competency would be expected to apply grouting techniques to load bearing and non-load bearing vertical and horizontal joints between prefabricated concrete elements. Completion of the general construction induction training program, specified in the Safe Work Australia model Code of Practice: Construction Work, is required by anyone carrying out construction work. Achievement of CPCWHS1001 Prepare to work safely in the construction industry meets this requirement. Licensing, legislative, regulatory or certification requirements apply to this unit of competency in some states and territories. For further infor

Elements & Learning Outcomes

6
E1Access requirements to grout prefabricated concrete elements.
0526.E1.O1Review and clarify grouting task and accessibility to enable the grouting to be placed in accordance with the erection prefabricated design documentation and material data sheets.
0526.E1.O2Review erection design documentation for task specifications and check to make sure they are in accordance with regulations, standards and codes of practice.
0526.E1.O3Review work health and safety (WHS) requirements for the task in accordance with safety plans and policies.
0526.E1.O4Identify safety signage and barricade requirements.
0526.E1.O5Review environmental requirements for the task in accordance with environmental plans and legislative requirements.
0526.E1.O6Access plant, tools, equipment and materials required to carry out task.
0526.E1.O7Locate the joints and confirm safety requirements, including working aloft, fall protection
E2Prepare to grout prefabricated concrete elements.
0526.E2.O1Erect identified safety signage and barricade requirements, and fit personal protective equipment (PPE).
0526.E2.O2Obtain plant, tools, equipment, check for serviceability and rectify or report any faults.
0526.E2.O3Identify materials and associated quantities/measurements required for grouting according to specifications and material data sheets.
0526.E2.O4Review the erection design documentation and the material data sheets and check if removal of shims or levelling packers are required after initial grouting has cured.
0526.E2.O5Review the erection design documentation and the material data sheets to verify which gaps are to be grouted.
E3Mix dry pack or trowelable grout.
0526.E3.O1Check the erection design documentation and the material data sheets to confirm compliance with compressive and tensile strength grout requirements.
0526.E3.O2Establish the volume of dry pack grout required and mix in accordance with specifications and material data sheet to ensure it is the desired consistency.
E4Mix flowable grout.
0526.E4.O1Establish the volume of flowable grout required and mix in accordance with specifications and material data sheet to ensure it is the desired consistency so as to be free flowing and bleed from grout breathers and/or flow tubes.
0526.E4.O2Check that all grout tubes, breathers and areas to be grout filled are clear and free from debris, contaminants and/or loose materials.
0526.E4.O3Check the grout mixture for the desired consistency and flow property and adjust accordingly in accordance with the erection design documentation and the material data sheets.
E5Prepare prefabricated concrete joint and apply grouting.
0526.E5.O1Ensure that all prefabricated concrete joint surfaces are prepared in accordance with the specifications and material data sheets.
0526.E5.O2Ensure all surfaces are clean, sound and free from dust, oils or other contaminants.
0526.E5.O3Prepare the grouting surface in accordance with the erection design documentation and the material data sheets.
0526.E5.O4Seal perimeter of the area to be grouted in accordance with specifications.
0526.E5.O5Apply grout in accordance with the project specifications.
0526.E5.O6Ensure that dry pack or trowelable grout is placed in a manner that ensures consolidation by tamping/rodding to eliminate any air voids.
0526.E5.O7Once complete, compare the actual volume of grout to the calculated volume of grout required to ensure no blockage and/or air voids have formed.
E6Clean up.
0526.E6.O1Clear work area and dispose of, reuse or recycle materials in accordance with regulatory and workplace requirements.
0526.E6.O2Clean, check, maintain and store tools and equipment in accordance with manufacturer and workplace requirements.
SEAL — South East Asia Learning Identifier & Skills Portal · Prepared for MLVT Executive approval and TVET institute review · Derived from the Australian National Training Register (training.gov.au, CC-BY) and aligned to the Cambodian Qualifications Framework and DSC Standard Training Packages · Delivered via Gibble SMS · July 2026